540 UPDATES – Raleigh NC


Western Wake Freeway Background and Description

The Raleigh Durham Roadbuilders Design-Build Team was selected by the North Carolina Turnpike Authority to design and construct the Western Wake Freeway section of the Triangle Expressway.

The Western Wake Freeway is a new multi-lane toll facility from existing NC 540 in western Wake County south of I-40 to NC 55 Bypass in Holly Springs, with a length of approximately 12.6 miles. Interchange connections are proposed for access at NC 55, at Green Level Road, US 64, Old US 1, US 1 and ending at the NC 55 Bypass at Holly Springs.

Western Wake 540 by-pass

Latest news and updates may be found here http://www.ncdot.gov/turnpike/#0

The SOUTHEAST 540 triangle Expressway updates may be found here: http://southeastextension.blogspot.com/

Advertisements

About Raleigh Homes Info

Greetings, My name is Tom Bohlmann. I am Allen Tate Realtor / Broker in the Raleigh, Durham, Wake Forest, Cary North Carolina areas. Your Home Search starts here: http://www.allentate.com/tombohlmann I have been involved in the Raleigh area real estate investing since 1995. I know all the ins and outs of many many different area markets that the average or even above average Realtor does not know. Give me a call or email so we can talk about your Real Estate Needs. Tom 919-543-5714
This entry was posted in Uncategorized and tagged , , . Bookmark the permalink.